Consultancy, Supervision and Project Management Consultancy
Overall Total
Total equivalent population (person) : 1000000
Total plant flow (m³/day) : 135000
Project: Consulting Services For The Construction Supervision For R2 Reservoir
Client :
Description of The Work :
The scope of works for the contract includes construction of:
- Water storage reservoir with 135 ML water storage capacity and 163 m x 140 m x 6 m dimensions.
- Overflow system
- Pumping Station
- Power transformers
- Standbye power generation room
- Fuel tanks building
- Chlorination stationIrrigation pumping station
- Valve chambers and connecting pipework
- Pipework
- Warehouse store
- Guard house
- Parking
- Site roads and landscaping
- Boundary roads and landscaping
- Boundary roads and main gate
- Residential building
The Supervision Phase of contract shall be divided in 3 phases/parts, as indicated below:
- Pre-Construction Phase (Start Up Phase) – Before Construction
- Construction Phase (Construction Phase) – During Construction
- Task 1: Work Site Supervision
- Task 2: Training and Capacity Building
- Post-Construction Phase (Defect Liability Period)
Client:
Mayoralty of Baghdad
Date:
26.04.2022 / Ongoing​
Total Project Cost:
€ 1.326.328,76