Highway Design Works
In this project, professional supervision services of Ankara Interurban Bus Terminal (ASOT) peripheral roads and interchange project were carried out. Services covered supervision of excavation, fill, junction arrangement, bridge, under crossing, box and pipe culvert, road over structure, car balustrade, surface and ground drainage, traffic marking, lighting and landscaping works during construction according to designs and specifications; preparing revisions and detailed designs required during implementation; participating temporary acceptance; preparing as-build drawings at the end of the construction.
In addition to the services mentioned above, the detailed work program prepared by the construction "Contractor" was examined and the Employer was informed of the factors that may cause problems in work execution and of the measures found out. Monthly reports were prepared under the scope about the general situation of the construction; the project was successfully completed and put into operation.
CONSULTING SERVICES:
ER-GE performed the following services under the scope of this project:
- On behalf of Ankara Greater Municipality, supervision and control of execution of the implementation designs prepared by ER-GE,
- Preparation of revisions and other detailed designs needed in implementation,
- Control of payment statements,
- Performing all site tests (fill compaction, aggregate, concrete, asphalt, etc.)
- Performing temporary and final acceptances,
- Production of as-built drawings
CLIENT: Ankara Metropolitan Municipality
DATE: 1993
PROJECT COST: USD 18,000,000