Sewerage and Stormwater Network Design Works
Overall Total
Total plant flow (m³/day) : 16000
Length (km) : 60
Project: Application Design for Foça (Izmir) Sewerage System, Wastewater Biological Treatment Plant, Deep Sea Outfall Project
Client :
General Directorate of Bank of Provinces / Turkey
Description of The Work :