Sewerage and Stormwater Network Design Works
Overall Total
Total plant flow (m³/day) : 6000
Length (km) : 70
Project: Armutlu (Bursa) Sewerage Network and Wastewater Treatment Plant and Deep Sea Outfall Project
Client :
General Directorate of Bank of Provinces / Turkey
Description of The Work :