Sewerage and Stormwater Network Design Works
Overall Total
Total plant flow (m³/day) : 15000
Length (km) : 17
Project: Malatya Stormwater Drainage Project
Client :
General Directorate of Bank of Provinces / Turkey
Description of The Work :