Sewerage and Stormwater Network Design Works
Overall Total
Total plant flow (m³/day) : 40000
Length (km) : 100
Project: Sincan (Ankara) Shantytown Prevention Area Sewerage, Stormwater and Potable Water Project
Client :
Ankara Metropolitan Municipality / Aydıner Inc. Co.
Description of The Work :