Sewerage and Stormwater Network Design Works
Overall Total
Total plant flow (m³/day) : 3800
Length (km) : 40
Project: Sultanhisar (Aydın) Wastewater Collection Network and Treatment Plant
Client :
General Directorate of Bank of Provinces / Turkey
Description of The Work :