Solid Waste Projects (Sanitary Landfills)
Purpose of the Project is to construct a modern Sanitary Landfill System to collect the domestic solid waste from Adapazarı city, 6 districts and 14 towns, various industrial waste of domestic nature and the treatment sludge from Adapazarı Wastewater Treatment Plant. In addition, a Biological Treatment Plant to dispose of the leachate of the landfill site is also envisaged in the scope of the Project. Medical wastes will not be accepted to the landfill. A landfilling area has been designed with a capacity to cover the demand of 14 years (until 2021) of the Project area.
Design population of year 2021 was calculated as 511,958. For this population, amount of total domestic waste and the industrial waste with domestic nature is 3,000,000 m3.
Different components of Adapazarı Solid Waste Disposal Plant are given as follows:
- Entry Control Unit,
- Administration Building,
- Weighbridge Building,
- Duty Machines And Truck Garage, Workshop, Operation And Maintenance Building,
- Fire Water Tank,
- Transformer Building,
- Waste Fire Extinguishing Area,
- Wheel Washing Unit,
- Blower Building,
- Treatment Plant Operation Building,
- Leachate Balancing Tank,
- Leachate Treatment Plant (SBR),
- Sludge Tank,
- Gas Collection System,
- Gas Compressor and Incineration Plant,
- Separation Facilities,
- Compost Plant,
The land planned for the landfill is a woodland of 30 ha. Considering the topographical and geotechnical characteristics of the project area, the landfilling system has been designed as 3 lots to create the maximum landfill area and to minimize the excavation and backfill amounts. Total inner surface area of the lots is 30 ha. and the total storage capacity is 3,000,000 m3. Service roads were designed around the lots for access.
A Biological Treatment Plant (Activated Sludge), Sequencing Batch Reactor (SBR) to treat leachate of the landfill site is designed in the scope of the Project. The capacity of the treatment plant is 80 m3/day.
Different components of the Leachate Treatment Plant is given below:
- Leachate Balancing Tank,
- Leachate Treatment Tank (SBR),
- Blower Building,
- Treatment Plant Operation Building,
- Sludge Tank.
SERVICES:
- Preparation of the feasibility study,
- Ground surveys and assessment,
- Preparation of the implementation projects,
- Bill of quantities,
- Preparation of the construction works tender documents
CLIENT: Adapazarı Metropolitan Municipality.
DATE: 2005 - 2006
PROJECT COST: USD 23,000,000