Submarine Outfall Design Works
Overall Total
Outlet length (m) : 500
Outlet depth (m) : 20
Project: Ercis (Van) Wastewater Treatment Plant and Deep Lake Outfall Project
Client :
General Directorate of Bank of Provinces / Turkey
Description of The Work :