Wastewater Treatment Plants

Overall Total
Total plant flow (m³/day) : 55680
Total equivalent population (person) : 273360
Project: Çorlu Wastewater Treatment Plant
Client : General Directorate of State Hydraulic Works / Turkey
Description of The Work :

Çorlu District in Tekirdağ in the north-west of Turkey, is one of the most important district of Thrace Region.

In order to meet the standards, advanced treatment technologies are used and nutrient removal is achieved.

The wastewater treatment plant has been designed in two stages to treat the domestic wastewater until the target year 2030 in the first stage and until 2045 in the second stage.

Design flow:          1st stage 39.600 m3/day

                            2nd stage 55.680 m3/day

The wastewater treatment plant briefly consists of inlet and fine screens, aerated grit chambers, flowmeter chambers, anaerobic tank for phosphorus removal, aeration tanks (nitrification + denitrification) (Bardenpho process), final sedimentation tanks, UV disinfection unit, Disc filter for irrigation, RAS and WAS pumping station, sludge storage tank, sludge dewatering building (centrifugal decanters), administration building, blower building, transformer station, workshop, guard building and other auxiliary structures.

Wastewater Treatment Plant is designed in accordance with the design criteria and calculation methods of German ATV-DVWK Standards.

Services:

  • Implementation and detail design of wastewater treatment plant,
  • Preparation of technical specifications
  • Preparation of BOQ and cost estimations for Construction tender.

 

Client:  TR State Hydraulic Works (DSI) / Sewage Department

Date: 2012 – 2013

Total Service Cost: 73.000,00 USD

Capacity: 85.000 m3/day