Wastewater Treatment Plants

Overall Total
Total plant flow (m³/day) : 10200
Total equivalent population (person) : 51220
Project: Gumushane Wastewater Treatment Plant and Collector Line Final Project
Client : General Directorate of Bank of Provinces / Turkey
Description of The Work :

The treatment prosess applied is simultaneous denitrification process with aerobic sludge stabilisation and biological phosphorus removal.

The wastewater treatment plant consists of, coarse and fine screens, sewage pumping station, aerated grit chambers, flowmeter chamber, anaerobic tank for phosphorus removal, aeration tanks (nitrification + denitrification), final sedimentation tanks, RAS and WAS pumping station, sludge dewatering building, administration building, blower building, transformer station, guard building and other auxiliary structures.

Services:

  • Final design of wastewater treatment plant,
  • Preparation of technical specifications
  • Preparation of BOQ and cost estimations for Construction tender

 

Client:  General Directorate of Bank of Provinces

Date: 2008 – 2010

Total Service Cost: 115.000 USD

Capacity: 

The wastewater treatment plant has been designed in two stages to biologically treat the domestic wastewater. The first stage will serve until 2023 and the second stage will be until 2043.

Design flow rates and equivalent populations:  

1st Stage: Q=6750 m3/day, 36650 PE

2nd Stage: Q=10.200 m3/day, 51220 PE

test test test test test