Wastewater Treatment Plants

Overall Total
Total plant flow (m³/day) : 21600
Total equivalent population (person) : 108000
Project: Seferihisar Wastewater Treatment Plant Implementation Design Project
Client : Izmir Metropolitan Municipality - Izmir Directorate of Water & Sewage / Turkey
Description of The Work :

In order to meet the standards, advanced treatment technologies are used and nutrient removal is achieved.

The wastewater treatment plant briefly consists of inlet and by-pass unit, screens, sewage pumping station, aerated grit chambers, flowmeter chambers, anaerobic tank for phosphorus removal, aeration tanks (nitrification + denitrification), final sedimentation tanks, UV disinfection unit, RAS and WAS pumping stations, sludge storage tank, sludge dewatering building (centrifugal decanters), administration building, blower building, transformer station, guard building and other auxiliary structures.

Wastewater Treatment Plant is designed in accordance with the design criteria and calculation methods of German ATV-DVWK Standards.

Services:

  • Implementation and detail design of wastewater treatment plant,
  • Preparation of technical specifications
  • Preparation of BOQ, and cost estimations for Construction tender.

 

Client: Izmir Metropolitan Municipality / Izmir Water and Sewerage Administration

Date: 2007 – 2007

Total Service Cost: 8,000,000 USD

Capacity: 

The wastewater treatment plant has been designed in two stages to biologically treat the domestic until the target year 2017 in the first stage and until 2040 in the second.

Design flow:          1st Stage      10,800 m3/day

2nd Stage      21,600 m3/day