In order to provide water for Gelibolu peninsula (Gelibolu, Eceabat, Şarköy, Evreşe neighborhoods), raw water supplied from Çokal Dam will be treated in water treatment plant. Çokal Dam is in the boundary of 11th Regional Directorate of DSI.
The capacity of the treatment plant is 100.000 m3/day. 1st phase of the treatment plant will serve year 2025 and has the capacity of 50.000 m3/day. 2nd phase of the treatment plant is an additional 50.000 m3/day for the target year 2045, enough space for the 2nd phase of the plant units is also considered in the treatment site.
Water treatment plant consists of: cascade aerator, disinfection, coagulation, flocculation, clarification and final disinfection units, in addition to above sludge treatment unit is also designed.
Services:
- Preparation of functional, architectural, structural, mechanical and electrical drawings,
- Preparation of functional, architectural, structural, mechanical and electrical projects for the treatment plant,
- Preparation of BoQs for all the equipments, instruments, mechanical and electrical materials,
Client:
TR State Hydraulic Works (DSI)
Department of Potable Water
Date: 2012 – 2013
Total Service Cost: 100.000 USD
Capacity: 100.000 m3/day