Total plant flow (m³/day) : 300000
Total equivalent population (person) : 1500000
Project: Samsun Selahattin Ereren Water Treatment Plant 1. Stage Rehabilitation Project and 2. Stage Detailed Design Project
Client :
Description of The Work :
Design of the second stage of the water treatment plant having a capacity of 300.000 m3/day composed of valve chambers, cascade aeration units, pre-ozonation units, rapid&slow mixing tanks, lamella clarifiers, rapid sand filters, chlorine contact tank, treated water storage tank and sludge treatment units.
Design includes all architectural, structural, mechanical, electrical (including SCADA) drawings. Also rehabilation project of first stage of the water treatment plant having a capacity of 200.000m3/day.
Date:
09/2019-ongoing
Contract Price:
390.000 TL