Water Treatment Plants

Overall Total
Total plant flow (m³/day) : 32400
Total equivalent population (person) : 162000
Project: Serdar/Turkmenistan Potable Water Treatment Plant Project
Client : Owadan Çeşme - Gensel İnşaat Ltd. Co.
Description of The Work :

Preparation of all process, architectural, structural, mechanical, installation and electrical drawings, landscape drawings, P&I diagram, hydraulic profile, road drawings, piping drawings, general layout & sections, all other shop drawings and bill of quantities for potable water treatment plant (32.400 m3/day capacity), water intake structure and intermediate water reservoir. Treatment system is composed of: cascade aeration system, preliminary settling tanks, coagulation & flocculation system, lamella clarifiers, pre-ozonisation, pressurized sand filters, post-ozonisation, activated carbon filters, final disinfection (post chlorination) systems and chemical treatment units for the removal of turbidity and hardness.

Treatment system is configured with most appropriate and innovative technologies as filtration, adsorption (activated carbon filters), disinfection (ozonisation) and chemical treatment units for the removal of turbidity and hardness. In addition to ozonisation; post chlorination via electrolysis method is added to the process in order to maintain the existence of residual chlorine till the latest consumer in the network of Serdar City.

Services:

  • Implementation design of the plant
  • Preparation of BoQ

 

Client:  Balkan Province Governorate / Owadançeşme – The Contractor

Date: 2011 – 2012

Total Service Cost: 200.000 USD

Capacity:  32.400 m3/day

test test test test test test test test test test test test test test test test test test test test test test test test test test test test test test test test