Water Treatment Plants

Overall Total
Total plant flow (m³/day) : 60000
Total equivalent population (person) : 325000
Project: Sirnak (Silopi) Water Treatment Plant Project
Client : General Directorate of State Hydraulic Works / Turkey
Description of The Work :

Silopi is located in south east of Turkey in Şırnak province with population projection of 324.430 in goal year of 2045. The source of water is Silopi Dam.

This project contains: Design of the potable water treatment plant with capacity of 60.000 m3/day, including cascade aeration, flocculation, coagulation, Lamella clarifier units and rapid sand filtration system.

Design includes all architectural, structural, mechanical, electrical (including SCADA) drawings.

Services:

  • Preparation work of application projects for supplying the potable water demand of Şırnak Province, Silopi District properly with technically, hydraulically and economically according to the technical specifications and criteria of General Directorate of DSİ (State Hydraulic Works). Capacity of the treatment plant: 60.000 m3/day.
  • The works which are prepared within the scope of project: Project reports (application project reports, process report, hydraulic report, calculations) architectural, structural (reinforcement concrete), electrical, SCADA / Automation and mechanical application projects, by-pass line, discharge line and discharge structure application projects, power grid projects for supplying of potable water treatment plant, application projects of transportation and service roads in the plant, geographical information system (GIS) works and bill of quantity.
  • Preparation of functional, architectural, structural, mechanical and electrical projects for the treatment plant. The treatment plant is comprised of the following units:
  • Inlet Valve and Flowmeter Room
  • Cascade Aeration Structure
  • Pre-Ozonisation Contact Tank
  • Pipe Appurtenances and Channels
  • Rapid Mixing Tank
  • Slow Mixing Tank
  • Clarification, Rapid Sand Filter
  • Backwash Water Reservoir
  • Chlorine Contact Tank
  • Treated Water Reservoir
  • Valve and Flowmeter Room
  • Sludge Thickening Tank
  • Backwash Water Holding Tank
  • Belt Filter
  • Administration Building
  • Transformer
  • Guard House
  • Chlorine Building
  • Chemical Building
  • Heating Center and Generator Building
  • Preparation of BoQ for all the equipment, instruments, mechanical and electrical materials.
  • Preparation of technical specification of water treatment plant.
  • Preparation of Landscaping.

 

Client:  Republic of Turkey State Hydraulic Works (DSI) / Department of Potable Water

Date: 2012 – 2013

Total Service Cost: 210.000 USD

Capacity: 60.000 m3/day